Rain of schemes for farmers.. ખેડૂતો માટે યોજનાઓનો વરસાદ...

Rain of schemes for farmers.. ખેડૂતો માટે યોજનાઓનો વરસાદ...  

HRT-14 (MIDH-TSP)



Unit Cost - Rs. 3.00 lakh / ha. % 50% of the cost with drip irrigation system in TSP area, maximum Rs. 1.00 lakh / ha • unit cost - Rs. 50,000 / ha • 50% free of cost drip irrigation system in TSP area, maximum Rs. 0.50 lakh / ha.


HRT-13 (MIDH-SCSP)


• Unit Cost - Rs. 3.00 lakh / ha. % 50% of cost with drip irrigation system, maximum Rs. 0.50 lakh / ha • unit cost - Rs. 30,000 / ha વિના 50% of cost without drip irrigation system, maximum Rs. 0.50 lakh / ha


HRT-4 (for SC)


• Unit Cost - Rs. 3.00 lakh / ha. % 50% of cost with drip irrigation system, maximum Rs. 0.50 lakh / ha • unit cost - Rs. 30,000 / ha વિના 50% of cost without drip irrigation system, maximum Rs. 0.50 lakh / ha


They will be eligible for assistance if they procure good quality seeds from the authorized seller of the seed producer for seed crops. સહાય Assistance will be available in 2 installments (2:25). • App. The farmer account holder of the caste should give preference to the farmer account holder who has adopted Micro Irrigation System (M.I.S.). The account holder of that farmer has to enter the planting record of horticultural crops in the water sheet. The farmer will have to provide an example of the talati of the area till the planting record is entered in the water table. • Innovative drip irrigation system will have to be developed. * 3 ha per beneficiary. Within the limits of


HRT-9


નિટ Unit Cost - Maximum `15.00 Lakh / ha. % 100% of public sector expenditure up to a maximum of `19.00 lakh per hectare, • 50% of private sector expenditure,` 2.50 lakh per hectare. At least 3000 seedlings / hectare should be prepared within the limit of


• Unit Cost - Maximum Rs. 15.00 lakhs / ha. % 100% of expenditure in public sector up to a maximum of Rs.12.0 lakh per hectare, • 50% of expenditure in private sector, Rs.2.50 lakh per hectare. At least 3000 seedlings / hectare should be prepared within the limit of


HRT-3 (for Scheduled Tribes)


• Unit Cost - Maximum Rs. 15.00 lakhs / ha. % 100% of expenditure in public sector up to a maximum of Rs.12.0 lakh per hectare, • 50% of expenditure in private sector, Rs.2.50 lakh per hectare. At least 3000 seedlings / hectare should be prepared within the limit of


HRT-4 (for SC)


• Unit Cost - Maximum Rs. 15.00 lakhs / ha. % 100% of expenditure in public sector up to a maximum of Rs.12.0 lakh per hectare, • 50% of expenditure in private sector, Rs.2.50 lakh per hectare. At least 3000 seedlings / hectare should be prepared within the limit of


Project base based fencing, mother plant plot, root plot, net house, irrigation facility, hi-tech greenhouse, hardening unit, pump house, steam sterilization, land solarization etc. should be included. • Will have to be done. વધારા Additional 5% supplementary assistance from the State Government એક Once per account


ખેડૂતો માટેની યોજનાઓ વિશે વધારે માહિતી માટે અહિયાં ટચ કરો.. 


યોજનામા અરજી કરવા માટે અહિયાં ટચ કરો.. 


રોપ-વે યાત્રાળુઓને ગિરનારના મા અંબાજી મંદિરે લઈ જશે, જે લોકોને શિખર પર પહોંચવા 5000 પગથિયા 

ચડવામાં  અસમર્થ હોય તેવા લોકોને અગમ્ય સુવિધા પૂરી પાડશે. 

ઓનલાઈન ટીકીટ બુક કરવા માટે નીચેની લીંક પર ક્લિક કરો.. 

https://udankhatola.com/


વધારે માહિતી મેળવવા માટે નીચેની લીંક પરથી વિડીયો જુઓ... 

https://youtu.be/0DKNRUroqzE


Comments